Post Reply 
Amortize specific period ranges
06-20-2015, 01:41 AM
Post: #3
RE: Amortize specific period ranges
(06-20-2015 01:31 AM)Dave Britten Wrote:  ...And just for fun/reference, here are the approximate amort times for 360 periods on a few different models.

n=360
i%/yr = 4.75
PV = 138,446.00
PMT = -722.20 (unrounded value, obtained via TVM solver)

10B: 4.25s
10BII: 3.5s
10BII+: 0.25s
12C (original, not ARM version): 1m27s
14B: 7.25s
17BII: 4.25s
200LX: 4s
Sharp EL-533: 46s
TI BAII Plus: 2.75s

Interesting results, I had no idea the 10BII+ is so much faster than the 10BII. Then again, I don't recall ever doing anything that wasn't effectively instant on these machines. Thanks for the testing and sharing results Dave.

--Bob Prosperi
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Amortize specific period ranges - rprosperi - 06-20-2015 01:41 AM
RE: Amortize specific period ranges - Gene - 06-24-2015, 08:45 PM



User(s) browsing this thread: 1 Guest(s)